Skip to content
Select Page

Dulles West Blvd.-Northstar Blvd. to Arcola Blvd. Public Information Meeting

NVTA Offices 3040 Williams Dr, Fairfax, VA

Overview This project provides for the planning, design, right of way acquisition, and construction of a four-lane median divided roadway between Northstar Blvd. and Arcola Blvd. This project is a continuation of Dulles West Boulevard from Dulles Landing Drive (under construction by others) up to the intersection of Northstar Blvd. The proposed alignment will maintain […]

Route 7 Corridor Study – Route 28 to Fairfax County Line Public Input Meeting

Online

Route 7 Corridor Study between Route 28 and the Fairfax County Line Welcome to Loudoun County’s Department of Transportation and Capital Infrastructure’s (DTCI) public input meeting site. Overview This draft corridor study examined existing and projected future conditions along Route 7 in Loudoun County, Virginia, between the Route 28 interchange and Dranesville Road (Route 228) […]

Prentice Drive-Lockridge Rd to Loudoun County Pkwy Public Comment Period

Online

**NVTA-funded project - $76,230,000 Overview This project provides for the design, right of way (ROW) acquisition and construction of a new segment of Prentice Drive (Route 1071) in Ashburn, VA from Lockridge Road (Route 789) to Loudoun County Parkway (Route 607). The roadway will be a four-lane urban major collector with turn lanes, in-road bike […]

Shellhorn Road Extended (Loudoun County) Public Comment Period

Online

*NVTA-funded project - $16M Overview This portion of the Shellhorn Road extension project will extend Shellhorn Road from Metropolitan Washington Airports Authority (MWAA) property northern boundary to and connect with the Sterling Blvd. extension. The project will realign some existing roads near the Loudoun Gateway Silver Line Station. These include Lockridge Road, Moran Road and […]

Public Information Meeting: Crosstrail Boulevard from Sycolin Road to the Dulles Greenway (Loudoun County)

Online

Hosted by Loudoun County’s Department of Transportation and Capital Infrastructure’s (DTCI) This Crosstrail Blvd. from Sycolin Rd. to Dulles Greenway project provides for the design and construction of a four-lane median-divided road between Sycolin Road and the Dulles Greenway Interchange. The length of this project is approximately 2,700 linear feet and includes a four-span bridge […]

Groundbreaking: Northstar Blvd. from Rt. 50 to Tall Cedars Pkwy (Loudoun County)

Parking Location, Aldie VA 41740 Tall Cedars Parkway, Aldie, VA

*NVTA-Funded Project Posted on: October 28, 2021 Groundbreaking for Northstar Boulevard from Route 50 to Tall Cedars Parkway Set for November 5 Loudoun County, in partnership with the Northern Virginia Transportation Authority (NVTA), invites members of the public to attend a groundbreaking ceremony for the start of construction of Northstar Boulevard, Phase II, from Route […]