Real-time Project Status Updates
To access real-time information on the current status of ongoing and completed NVTA regionally-funded transportation projects, and to search by project, project location, transportation mode, project sponsor, and corridor segment, please visit NoVA Gateway to explore and learn more!
Map of NVTA 70% Regionally-Funded Projects (FY2014-FY2027)
Click here to check out our interactive map of the multimodal, transportation projects the NVTA is funding. Scroll below for a detailed table of all the projects.
Status Reports for Funded Projects
Click here to see the latest updates on 70% projects funded by the NVTA (in a detailed format)
(Standard Version – Includes full status information and details to-date)
Click here to see the latest updates on 70% projects funded by the NVTA (in an abridged format)
(Short Form Version – Only shows projects with substantive changes in the last 3 months)
Click here for Status Reports for NVTA Regionally-Funded Projects (70%) from past months.
****
Click here for a Cumulative List of Projects Funded with NVTA 30% Local Funds (FY2014-FY2022)
*As of October 2022, $613,267,971 in NVTA Local Funds have been programmed by NoVA localities to invest in transportation needs.
(30% Local Funds are distributed to individual Northern Virginia localities and utilized for their transportation needs, including additional urban or secondary road construction; for other capital improvements that reduce congestion; for other transportation capital improvements which have been approved by the most recent long-range transportation plan adopted by the Authority; or for public transportation purposes.)
Table of NVTA Regionally-Funded 70% Projects (FY2014-FY2027)
The 70% projects shown below are funded by the NVTA through all funding programs, as of 7/14/2022.
The items within the thicker boxes are funding for the same larger project under different funding cycles.
A downloadable Table of NVTA Funded Projects (FY 2014-2027) can be found here.
Jurisdiction/ Agency | Project Title | NVTA Funding | NVTA Funding Program | Phases Funded |
---|---|---|---|---|
Arlington County | Silver/Blue Line Mitigation (4 New Buses) | $1,000,000 | FY 2014 | Asset Acquisition |
Arlington County | Boundary Channel Drive Interchange | $4,335,000 | FY 2014 | Construction |
Arlington County | Crystal City Multimodal Center | $1,500,000 | FY 2014 | Construction |
Arlington County | Columbia Pike Multimodal Street Improvements | $12,000,000 | FY 2014 | Construction |
Arlington County | Columbia Pike Multimodal Street Improvements – East End | $10,000,000 | FY 2015-16 | Design, Engineering, Construction |
Arlington County | Ballston Metrorail Station West Entrance | $12,000,000 | FY 2015-16 | Design |
Arlington County | Ballston Metrorail Station West Entrance | $80,000,000 | FY 2022-27 | Construction |
Arlington County | Glebe Road Corridor ITS Improvements | $2,000,000 | FY 2015-16 | Design, Engineering, Construction |
Arlington County | Lee Highway Corridor ITS Enhancements | $3,000,000 | FY 2017 | Design, Engineering, Right of way, Construction |
Arlington County | Crystal City Streets | $11,600,000 | FY 2017 | Design, Engineering, Right of way, Construction |
Arlington County | ART Operations and Maintenance Facilities | $39,027,000 | FY 2018-23 | Design, Engineering, Construction, Asset Acquisition |
Arlington County | Crystal City Metrorail Station East Entrance and Intermodal Connections | $5,000,000 | FY 2018-23 | Design, Engineering |
Arlington County | Pentagon City Multimodal Connections and Transitway Extension | $28,850,000 | FY 2018-23 | Construction |
Arlington County | Intelligent Transportation System Improvements | $10,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction, Asset Acquisition |
Arlington County | Rosslyn Multimodal Network Improvements | $11,874,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
Arlington County | CC2DCA Intermodal Connector: From Crystal City to Ronald Reagan Washington National Airport | $18,000,000 | FY 2020-25 | Design, Engineering, Construction |
Arlington County/NOVA Parks | Arlington W&OD Trail Enhancements | $650,000 | FY 2020-25 | Design, Engineering |
Arlington County Total | $250,836,000 | |||
Fairfax County/VDOT | Route 28 Widening 6 to 8 lanes (NB from McLearen Road to Dulles Toll Road) | $11,100,000 | FY 2014 | Construction |
Fairfax County/VDOT | Route 28 Widening 6 to 8 lanes (SB from Dulles Toll Road to Route 50) | $20,000,000 | FY 2014 | Construction |
Fairfax County | Innovation Center Metrorail Station | $41,000,000 | FY 2014 | Design, Right of way, Construction |
Fairfax County | Innovation Center Metrorail Station | $28,000,000 | FY 2015-16 | Construction |
Fairfax County | Connector Buses (12 New) | $6,000,000 | FY 2015-16 | Asset Acquisition |
Fairfax County | West Ox Bus Garage Expansion | $20,000,000 | FY 2015-16 | Construction |
Fairfax County | Fairfax County Parkway Widening Rte. 123 to Rte. 29 (Study) | $10,000,000 | FY 2015-16 | Study, Engineering |
Fairfax County | Fairfax County Parkway Widening Rte. 123 to Rte. 29 (widening) | $10,000,000 | FY 2017 | Right of way |
Fairfax County | Fairfax County Parkway Widening from Ox Road to Lee Highway includes a grade separated interchange at the intersection of Popes Head Road | $67,000,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Fairfax County Parkway Widening: Lee Highway (Route 29) to Nomes Court | $37,400,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
Fairfax County | Fairfax County Parkway Widening: Nomes Court to Route 123 | $108,000,000 | FY 2022-27 | Design, Engineering, Right of way, Construction |
Fairfax County | Frontier Drive Extension & Interchange Improvements | $2,000,000 | FY 2015-16 | Design, Engineering |
Fairfax County | Frontier Drive Extension and Intersection Improvements | $25,000,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000 | FY 2015-16 | Engineering |
Fairfax County | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000 | FY 2017 | Design, Engineering, Right of way |
Fairfax County | Route 28 Widening: Prince William County Line to Rte. 29 | $16,000,000 | FY 2018-23 | Construction |
Fairfax County | Rolling Road Widening – Old Keene Mill Road to Franconia Springfield Parkway | $5,000,000 | FY 2015-16 | Design, Engineering, Right of way |
Fairfax County | Rolling Road Widening: Hunter Village Drive to Old Keene Mill Road | $11,111,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Rolling Road Widening: Hunter Village Drive to Old Keene Mill Road | $27,700,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
Fairfax County | Route 1 Widening – Mount Vernon Memorial Highway to Napper Road | $1,000,000 | FY 2015-16 | Design, Engineering |
Fairfax County | Route 1 Widening – Mount Vernon Memorial Highway to Napper Road | $127,000,000 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway Widening (Mount Vernon Memorial Highway/Jeff Todd Way to Sherwood Hall Lane) | $120,387,962 | FY 2020-25 | Right of way, Construction |
Fairfax County | Richmond Highway Widening From Mt. Vernon Memorial Highway/Jeff Todd Way to Sherwood Hall Lane | $60,207,038 | FY 2022-27 | Design, Right of way, Construction |
Fairfax County/VDOT | Route 7 Bridge Widening: Over Dulles Toll Road | $13,900,000 | FY 2015-16 | Construction |
Fairfax County | Route 7 Widening – Colvin Forest Drive to Jarrett Valley Drive | $10,000,000 | FY 2017 | Right of way |
Fairfax County | Rock Hill Road Bridge | $20,604,670 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway Bus Rapid Transit – Phases I & II | $250,000,000 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway (Route 1) BRT | $80,000,000 | FY 2022-27 | Design, Right of way, Construction |
Fairfax County | Richmond Highway (Route 1)/CSX Underpass Widening | $12,000,000 | FY 2018-23 | Construction |
Fairfax County | Soapstone Drive Extension: Sunset Hills Road to Sunrise Valley Drive | $15,000,000 | FY 2020-25 | Design, Right of way, Construction |
Fairfax County | Soapstone Drive Extension: Sunset Hills Road to Sunrise Valley Drive | $73,793,037 | FY 2022-27 | Design, Right of way, Construction |
Fairfax County | 8 New Battery Electric Buses – Fairfax Connector Buses for Tysons to Franconia Service | $10,000,000 | FY 2022-27 | Asset Acquisition |
Fairfax County | Seven Corners Ring Road Improvements: Arlington Boulevard (Route 50) Westbound Ramp to Castle Place/Sleepy Hollow Road | $4,200,000 | FY 2022-27 | Design |
Fairfax County Total | $1,253,403,707 | |||
Loudoun County | Leesburg Park and Ride | $1,000,000 | FY 2014 | Right of way, Construction |
Loudoun County | Two New Transit Buses | $880,000 | FY 2014 | Asset Acquisition |
Loudoun County/VDOT | Route 28 Hot Spot Improvements (Sterling Boulevard to the Dulles Toll Road) | $12,400,000 | FY 2014 | Construction |
Loudoun County | Belmont Ridge Road, North of the Dulles Greenway | $20,000,000 | FY 2014 | Right of way, Construction |
Loudoun County | Belmont Ridge Road Widening (Truro Parish Dr to Croson Ln) | $19,500,000 | FY 2015-16 | Construction |
Loudoun County | Transit Buses (4 New) | $1,860,000 | FY 2015-16 | Asset Acquisition |
Loudoun County | Loudoun County Parkway Development | $31,000,000 | FY 2015-16 | Construction |
Loudoun County | Route 28 Northbound Widening –between the Dulles Toll Road and Sterling Boulevard | $20,000,000 | FY 2018-23 | Construction |
Loudoun County | Route 15 Bypass Widening: Battlefield Parkway to Montresor Road | $54,000,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Extend Shellhorn Road: Loudoun County Parkway (Route 607) to Randolph Drive (Route 1072) | $16,000,000 | FY 2018-23 | Right of way |
Loudoun County | Northstar Boulevard – Evergreen Mills Road (formerly Shreveport Drive) to Tall Cedars Parkway | $64,805,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Prentice Drive Extension: Lockridge Road (Route 789) to Shellhorn Road (Route 643) | $76,230,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Dulles West Boulevard Widening: Loudoun County Parkway to Northstar Boulevard | $47,800,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Route 9 Traffic Calming | $12,112,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Evergreen Mills Road Intersection Realignments – Watson Road and Reservoir Road | $14,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Construct Crosstrail Boulevard (Route 653): Sycolin Road to Dulles Greenway (Route 267) | $36,700,000 | FY 2020-25 | Construction |
Loudoun County | Evergreen Mills Road Widening from Northstar Boulevard to Stone Springs Boulevard | $18,000,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
Loudoun County | Route 7 Corridor ITS Implementation Program | $2,500,000 | FY 2022-27 | Construction |
Loudoun County | Route 7 Improvements: Route 9 to Dulles Greenway | $20,000,000 | FY 2022-27 | Right of way, Construction |
Loudoun County | Ryan Road Widening (Phase 2): Evergreen Mills Road to Beaverdam Drive | $16,000,000 | FY 2022-27 | Right of way, Construction |
Loudoun County | Loudoun County Parkway Interchange at US 50 | $35,250,000 | FY 2022-27 | Design, Engineering, Right of way, Construction |
Loudoun County Total | $520,037,000 | |||
Prince William County | Route 28 From Linton Hall Road to Fitzwater Drive | $28,000,000 | FY 2014 | Engineering, Right of way, Construction |
Prince William County | Route 28 Widening: Route 234 Bypass to Linton Hall Road | $16,700,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
Prince William County | Route 28 Widening: Route 234 Bypass to Linton Hall Road | $10,000,000 | FY 2017 | Construction |
Prince William County | RT28 corridor improvements (Fitzwater Dr to Pennsylvania Ave) | $15,000,000 | FY 2018-23 | Construction |
Prince William County | Route 1 From Featherstone Road to Mary’s Way | $3,000,000 | FY 2014 | Design, Engineering |
Prince William County | Route 1 Widening: Featherstone Road to Mary’s Way | $49,400,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
Prince William County | Route 1 Widening: Featherstone Road to Mary’s Way | $11,000,000 | FY 2017 | Construction |
Prince William County (previously Town of Dumfries) | Route 1 (Fraley Blvd) Widening: Brady’s Hill Road to Dumfries Road | $6,900,000 | FY 2015-16 | Design, Engineering |
Prince William County (previously Town of Dumfries) | Widen Route 1 (Fraley Blvd) to six lanes between Brady’s Hill Rd and Dumfries Rd (RT234) | $44,860,000 | FY 2018-23 | Right of way |
Prince William County (previously Town of Dumfries) | Widen Route 1 (Fraley Blvd) to six lanes between Brady’s Hill Rd and Dumfries Rd (RT234) | $78,000,000 | FY 2020-25 | Construction |
Prince William/Manassas | Route 28 Congestion Study – Godwin Drive Extension Alternative | $2,500,000 | FY 2015-16 | Study |
Prince William County | Route 28 Corridor Feasibility Study – Environmental Impact Statement (City of Manassas to Fairfax County) | $3,500,000 | FY 2018-23 | Study, Design |
Prince William County | Construct Route 28 Corridor Roadway Improvements | $89,000,000 | FY 2018-23 | Engineering, Right of way, Construction |
Prince William County | Construct Interchange at Prince William Parkway and Clover Hill Road | $1,900,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Construct Interchange at Prince William Parkway and University Blvd | $24,200,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Construct Interchange at Route 234 and Brentsville Road | $54,900,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Summit School Rd Extension and Telegraph Rd Widening | $11,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Summit School Rd Extension and Telegraph Rd Widening | $24,000,000 | FY 2020-25 | Construction |
Prince William County | North Woodbridge Mobility Improvements | $8,000,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
Prince William County | University Boulevard Extension: Devlin Road to Wellington Road | $53,000,000 | FY 2022-27 | Construction |
Prince William County | Old Bridge Road Widening: Colby Drive to Minnieville Road | $25,000,000 | FY 2022-27 | Design, Engineering, Right of way, Construction |
Prince William County | Van Buren Road North Extension: Route 234 to Cardinal Drive | $8,000,000 | FY 2022-27 | Design, Engineering |
Prince William County | Route 1 at Route 123 Interchange | $3,000,000 | FY 2022-27 | Design, Engineering |
Prince William County Total | $570,860,000 | |||
City of Alexandria | Traffic Signal Upgrades/Transit Signal Priority | $660,000 | FY 2014 | Design, Engineering, Construction |
City of Alexandria | Duke Street Transit Signal Priority Installation | $190,000 | FY 2015-16 | Design, Asset acquisition |
City of Alexandria | DASH Bus Expansion (5 New) | $1,462,500 | FY 2014 | Asset Acquisition |
City of Alexandria | Shelters and RTI for DASH/WMATA | $450,000 | FY 2014 | Construction |
City of Alexandria | Potomac Yard Metrorail Station EIS | $2,000,000 | FY 2014 | Planning, Desing, Engineering |
City of Alexandria | Potomac Yard Metrorail Station | $1,500,000 | FY 2015-16 | Engineering |
City of Alexandria | Potomac Yard Metrorail Station | $66,000,000 | FY 2017 | Design, Engineering, Construction |
City of Alexandria | West End Transitway Study | $2,400,000 | FY 2015-16 | Design |
City of Alexandria | West End Transitway: Northern Segment (Phase 1) | $2,200,000 | FY 2018-23 | Right of way |
City of Alexandria | West End Transitway Phase 1b: South Van Dorn Street and Bridge Design | $5,000,000 | FY 2022-27 | Design, Engineering |
City of Alexandria | Alexandria ITS Projects | $1,195,491 | FY 2018-23 | Design, Engineering, Construction |
City of Alexandria | Alexandria Bus Network ITS | $150,000 | FY 2018-23 | Asset acquisition, Other |
City of Alexandria | DASH Transit Service Enhancements and Expansion | $11,933,161 | FY 2018-23 | Construction, Asset Acquisition, Other |
City of Alexandria | Alexandria Duke St Transitway | $12,000,000 | FY 2018-23 | Design, Engineering |
City of Alexandria | Alexandria Duke St Transitway | $75,000,000 | FY 2020-25 | Right of way, Construction, Asset acquisition |
City of Alexandria | Alexandria Bike and Pedestrian Trails Construction and Reconstruction: Holmes Run Trail – Dora Kelly Fair-weather Crossing Bridge | $5,000,000 | FY 2022-27 | Construction |
City of Alexandria Total | $187,141,152 |
|||
City of Fairfax | Cue 35-Foot Buses (6 New) | $3,000,000 | FY 2015-16 | Asset Acquisition |
City of Fairfax | Chain Bridge Road Widening/Improvements | $5,000,000 | FY 2014 | Right of way, Construction |
City of Fairfax | Northfax – Intersection Improvements at Route 29/50 and Route 123 | $10,000,000 | FY 2015-16 | Construction |
City of Fairfax | Kamp Washington Intersection Improvements | $1,000,000 | FY 2015-16 | Construction |
City of Fairfax | Jermantown / Route 50 Roadway Improvements | $1,000,000 | FY 2015-16 | Construction |
City of Fairfax | Jermantown Road Corridor Improvements Project | $21,000,000 | FY 2018-23 | Design, Right of way, Construction |
City of Fairfax | Intersection Improvements at Eaton Place/Chain Bridge Road | $10,750,000 | FY 2018-23 | Design, Right of way, Construction |
City of Fairfax | Old Lee Highway Multimodal Improvements Phase 1 | $5,000,000 | FY 2018-23 | ROW, Construction |
City of Fairfax | Old Lee Highway Multimodal Improvements | $8,000,000 | FY 2020-25 | Construction |
City of Fairfax | Roadway Network Northfax West | $2,500,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
City of Fairfax | Roadway Network Northfax West | $2,200,000 | FY 2020-25 | Right of way, Construction |
City of Fairfax | Jermantown Road/Route 29 Intersection Improvements | $700,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
City of Fairfax | Government Center Parkway Extension | $3,540,000 | FY 2020-25 | Right of way, Construction |
City of Fairfax Total | $73,690,000 | |||
City of Falls Church | Funding for Bus Shelters | $200,000 | FY 2014 | Design, Engineering, Right of way, Construction |
City of Falls Church | Pedestrian Access to Transit | $700,000 | FY 2014 | Design, Engineering, Right of way, Construction |
City of Falls Church | Pedestrian Bridge at Van Buren Street | $300,000 | FY 2014 | Design, Engineering, Construction |
City of Falls Church | West Falls Church & Joint Campus Revitalization District Multimodal Transportation Project | $15,700,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
City of Falls Church | West Falls Church Access to Transit and Multimodal Connectivity | $6,900,000 | FY 2020-25 | Design, Engineering, Right of way, Construction |
City of Falls Church | Downtown Falls Church Multimodal Improvements | $8,300,000 | FY 2020-25 | Right of way, Construction |
City of Falls Church/NOVA Parks | Falls Church Enhanced Regional Bike Routes (W&OD) | $3,244,959 | FY 2018-23 | Design, Engineering, Construction |
City of Falls Church | North Washington Street Multimodal Improvements Project: Great Falls Street to Gresham Place | $22,500,000 | FY-2022-27 | Design, Engineering, Right of way, Construction |
City of Falls Church Total | $57,844,959 | |||
City of Manassas | Route 28 Widening: Godwin Drive to the Southern City Limits | $3,294,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
City of Manassas | Liberia Avenue 3rd Lane Eastbound: Route 28 to Euclid Avenue | $8,851,639 | FY 2022-27 | Design, Engineering, Right of way, Construction |
City of Manassas Total | $12,145,639 | |||
Town of Herndon | Herndon Metrorail Intermodal Access improvements | $1,100,000 | FY 2014 | Right of way, Construction |
Town of Herndon | Herndon Parkway Intersection Improvements at Van Buren St | $500,000 | FY 2014 | Construction |
Town of Herndon | Herndon Parkway Intersection Improvements at Sterling Rd | $500,000 | FY 2014 | Design, Engineering, Right of way, Construction |
Town of Herndon | East Elden Street Improvements & Widening | $10,400,000 | FY 2015-16 | Right of way |
Town of Herndon | Herndon Parkway Improvements at Worldgate Drive Extension | $4,581,000 | FY 2022-27 | Right of way, Construction |
Town of Herndon Total | $17,081,000 | |||
Town of Leesburg | Route 7/Battlefield Parkway Interchange | $13,000,000 | FY 2015-16 | Design, Engineering, Right of way |
Town of Leesburg | Route 7 (East Market Street)/Battlefield Parkway Interchange | $20,000,000 | FY 2017 | Construction |
Town of Leesburg | Construct Interchange at Route 7 and Battlefield Parkway | $25,000,000 | FY 2018-23 | Construction |
Town of Leesburg | Edwards Ferry Road at the Route 15 Leesburg Bypass Grade Separation | $1,000,000 | FY 2014 | Design |
Town of Leesburg | Route 15 Bypass/Edwards Ferry Road Interchange | $1,000,000 | FY 2015-16 | Design |
Town of Leesburg | Interchange Improvements at Route 15 Leesburg Bypass and Edwards Ferry Road | $5,400,000 | FY 2018-23 | Design, Engineering |
Town of Leesburg | Construct Interchange at Route 15 Bypass and Battlefield Parkway | $2,000,000 | FY 2018-23 | Design, Engineering |
Town of Leesburg Total | $67,400,000 | |||
Town of Vienna | Mill St NE Parking Garage | $2,300,000 | FY 2018-23 | Asset Acquisition |
NVTC | Transit Alternatives Analysis Study in the Route 7 Corridor | $838,000 | FY 2014 | Study |
PRTC | PRTC New Gainesville Service (1 Bus) | $580,000 | FY 2014 | Asset Acquisition |
PRTC | Western Bus Maintenance & Storage Facility | $16,500,000 | FY 2015-16 | Construction |
PRTC Total | $17,080,000 | |||
VRE | VRE Lorton Station Second Platform | $800,270 | FY 2014 | Design, Engineering, Construction |
VRE | VRE Gainesville-Haymarket Extension/Broad Run Expansion Project Development | $1,500,000 | FY 2014 | Planning, Design |
VRE | Franconia-Springfield Platform Improvements | $13,000,000 | FY 2015-16 | Design, Engineering, Construction |
VRE | Rippon Station Expansion and Second Platform | $39,482 | FY 2015-16 | Design, Engineering, Construction |
VRE | Slaters Lane Rail Crossover | $7,000,000 | FY 2015-16 | Design, Engineering, Construction |
VRE | Crystal City Platform Extension Study | $400,000 | FY 2015-16 | Study |
VRE | VRE Crystal City Station Improvements | $4,000,000 | FY 2018-23 | Design, Engineering |
VRE | VRE Crystal City Station Improvements | $15,800,000 | FY 2020-25 | Construction |
VRE | Manassas Park Station Parking Expansion | $500,000 | FY 2015-16 | Study |
VRE | Manassas Park Station Parking Expansion | $2,000,000 | FY 2017 | Design, Engineering |
VRE Total | $45,039,752 | |||
WMATA | Traction Power Upgrades on the Orange Line in Virginia | $4,978,685 | FY 2014 | Design, Engineering, Construction |
WMATA | Blue Line Traction Power Upgrades | $17,443,951 | FY 2017 | Design, Engineering, Construction |
WMATA Total | $22,422,636 | |||
DRPT | Franconia‐Springfield Passenger Rail Bypass | $22,958,821 | FY 2020-25 | Construction |
NVTA FUNDING TOTAL | $3,121,078,666 |
The projects shown below were approved by the Authority for funding but were withdrawn subsequently by the project sponsor.
Jurisdiction/ Agency | Project Title | NVTA Funding | NVTA Funding Program | Phases Funded |
---|---|---|---|---|
Fairfax County | I-66/Route 28 Interchange Improvements ** | $300,000,000 | FY 2017 | Design, Engineering, Environmental, Right of way, Construction |
VRE | VRE Rolling Stock Purchase | $19,800,000 | FY 2014 | Train Purchase |
VRE | VRE Alexandria Station Tunnel and Platform Improvements | $1,300,000 | FY 2014 | Construction |
WMATA | Ten New Buses on Virginia Routes | $7,000,000 | FY 2014 | Bus Purchase |
WMATA | 8 Car Train Traction Power Upgrades | $8,995,000 | FY 2015-16 | Construction |
TOTAL | $335,795,000 |
**The Authority de-allocated $300 million from its FY 2017 funding program for the I-66/Route28 Interchange Improvements, which were encompassed in the Transform I-66 Outside the Beltway Project.
NVTA Funding by Corridor:
Corridor | NVTA Funding |
---|---|
Rt. 7/Dulles Toll Road/Silver Line | $386,264,037 |
Loudoun County Parkway/Rt. 234 | $465,335,000 |
Route 28 | $289,950,309 |
Prince William Parkway | $35,000,000 |
Fairfax County Parkway | $302,211,000 |
I-66/US 29/US 50/Orange-Silver Line/VRE Manassas | $239,017,644 |
I-495 | $114,783,161 |
I-95/I-395/US 1/VRE Fredericksburg/Blue‑Yellow Line | $1,141,417,515 |
US 15 | $56,000,000 |
Columbia Pike/Braddock Road/VRE Manassas | $55,850,000 |
US 50 | $35,250,000 |
Total | $3,121,078,666 |