Real-time Project Status Updates
To access real-time information on the current status of ongoing and completed NVTA regionally-funded transportation projects, and to search by project, project location, transportation mode, project sponsor, and corridor segment, please visit NoVA Gateway to explore and learn more!
Map of NVTA Funded Projects (FY 2014-2023)
Click here to check out our interactive map of the multimodal, transportation projects the NVTA is funding. Scroll below for a detailed table of all the projects.
Status Reports for Funded Projects
Click here to see the latest updates on projects funded by the NVTA
(Standard Version – Includes full status information and details to-date)
Click here to see the latest updates on projects funded by the NVTA
(Short Form Version – Only shows projects with substantive changes in the last 3 months)
Click here for Status Reports for NVTA-Funded Projects from past months.
Table of NVTA Funded Projects (FY 2014-2025)
The projects shown below are funded by the NVTA through all funding programs, as of 7/24/2020.
The items within the thicker boxes are funding for the same larger project under different funding cycles.
A downloadable Table of NVTA Funded Projects (FY 2014-2025) can be found here.
Jurisdiction/ Agency | Project Title | NVTA Funding | NVTA Funding Program | Phases Funded |
---|---|---|---|---|
Arlington County | Silver/Blue Line Mitigation (4 New Buses) | $1,000,000 | FY 2014 | Asset Acquisition |
Arlington County | Boundary Channel Drive Interchange | $4,335,000 | FY 2014 | Construction |
Arlington County | Crystal City Multimodal Center | $1,500,000 | FY 2014 | Construction |
Arlington County | Columbia Pike Multimodal Street Improvements | $12,000,000 | FY 2014 | Construction |
Arlington County | Columbia Pike Multimodal Street Improvements – East End | $10,000,000 | FY 2015-16 | Design, Engineering, Construction |
Arlington County | Ballston Metrorail Station West Entrance | $12,000,000 | FY 2015-16 | Design |
Arlington County | Glebe Road Corridor ITS Improvements | $2,000,000 | FY 2015-16 | Design, Engineering, Construction |
Arlington County | Lee Highway Corridor ITS Enhancements | $3,000,000 | FY 2017 | Design, Engineering, Right of way, Construction |
Arlington County | Crystal City Streets | $11,600,000 | FY 2017 | Design, Engineering, Right of way, Construction |
Arlington County | ART Operations and Maintenance Facilities | $39,027,000 | FY 2018-23 | Design, Engineering, Construction, Asset Acquisition |
Arlington County | Crystal City Metrorail Station East Entrance and Intermodal Connections | $5,000,000 | FY 2018-23 | Design, Engineering |
Arlington County | Pentagon City Multimodal Connections and Transitway Extension | $28,850,000 | FY 2018-23 | Construction |
Arlington County | Intelligent Transportation System Improvements | $10,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction, Asset Acquisition |
Arlington County | Rosslyn Multimodal Network Improvements | $11,874,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
Arlington County | CC2DCA Intermodal Connector: From Crystal City to Ronald Reagan Washington National Airport | $18,000,000 | FY2020-25 | Design, Engineering, Construction |
Arlington County/NOVA Parks | Arlington W&OD Trail Enhancements | $650,000 | FY2020-25 | Design, Engineering |
Fairfax County/VDOT | Route 28 Widening 6 to 8 lanes (NB from McLearen Road to Dulles Toll Road) | $11,100,000 | FY 2014 | Construction |
Fairfax County/VDOT | Route 28 Widening 6 to 8 lanes (SB from Dulles Toll Road to Route 50) | $20,000,000 | FY 2014 | Construction |
Fairfax County | Innovation Center Metrorail Station | $41,000,000 | FY 2014 | Design, Right of way, Construction |
Fairfax County | Innovation Center Metrorail Station | $28,000,000 | FY 2015-16 | Construction |
Fairfax County | Connector Buses (12 New) | $6,000,000 | FY 2015-16 | Asset Acquisition |
Fairfax County | West Ox Bus Garage Expansion | $20,000,000 | FY 2015-16 | Construction |
Fairfax County | Fairfax County Parkway Widening Rte. 123 to Rte. 29 (Study) | $10,000,000 | FY 2015-16 | Study, Engineering |
Fairfax County | Fairfax County Parkway Widening Rte. 123 to Rte. 29 (widening) | $10,000,000 | FY 2017 | Right of way |
Fairfax County | Fairfax County Parkway Widening from Ox Road to Lee Highway includes a grade separated interchange at the intersection of Popes Head Road | $67,000,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Fairfax County Parkway Widening: Lee Highway (Route 29) to Nomes Court | $37,400,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
Fairfax County | Frontier Drive Extension & Interchange Improvements | $2,000,000 | FY 2015-16 | Design, Engineering |
Fairfax County | Frontier Drive Extension and Intersection Improvements | $25,000,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000 | FY 2015-16 | Engineering |
Fairfax County | Route 28 Widening: Prince William County Line to Route 29 | $5,000,000 | FY 2017 | Design, Engineering, Right of way |
Fairfax County | Route 28 Widening: Prince William County Line to Rte. 29 | $16,000,000 | FY 2018-23 | Construction |
Fairfax County | Rolling Road Widening – Old Keene Mill Road to Franconia Springfield Parkway | $5,000,000 | FY 2015-16 | Design, Engineering, Right of way |
Fairfax County | Rolling Road Widening: Hunter Village Drive to Old Keene Mill Road | $11,111,000 | FY 2018-23 | Right of way, Construction |
Fairfax County | Rolling Road Widening: Hunter Village Drive to Old Keene Mill Road | $27,700,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
Fairfax County | Route 1 Widening – Mount Vernon Memorial Highway to Napper Road | $1,000,000 | FY 2015-16 | Design, Engineering |
Fairfax County | Route 1 Widening – Mount Vernon Memorial Highway to Napper Road | $127,000,000 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway Widening From Route 235 North to Route 235 South | $120,387,962 | FY2020-25 | Right of way, Construction |
Fairfax County/VDOT | Route 7 Bridge Widening: Over Dulles Toll Road | $13,900,000 | FY 2015-16 | Construction |
Fairfax County | Route 7 Widening – Colvin Forest Drive to Jarrett Valley Drive | $10,000,000 | FY 2017 | Right of way |
Fairfax County | Rock Hill Road Bridge | $20,604,670 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway Bus Rapid Transit – Phases I & II | $250,000,000 | FY 2018-23 | Design, Right of way, Construction |
Fairfax County | Richmond Highway (Route 1)/CSX Underpass Widening | $12,000,000 | FY 2018-23 | Construction |
Fairfax County | Soapstone Drive Extension: Sunset Hills Road to Sunrise Valley Drive | $15,000,000 | FY2020-25 | Design, Right of way, Construction |
Loudoun County | Leesburg Park and Ride | $1,000,000 | FY 2014 | Right of way, Construction |
Loudoun County | Two New Transit Buses | $880,000 | FY 2014 | Asset Acquisition |
Loudoun County/VDOT | Route 28 Hot Spot Improvements (Sterling Boulevard to the Dulles Toll Road) | $12,400,000 | FY 2014 | Construction |
Loudoun County | Belmont Ridge Road, North of the Dulles Greenway | $20,000,000 | FY 2014 | Right of way, Construction |
Loudoun County | Belmont Ridge Road Widening (Truro Parish Dr to Croson Ln) | $19,500,000 | FY 2015-16 | Construction |
Loudoun County | Transit Buses (4 New) | $1,860,000 | FY 2015-16 | Asset Acquisition |
Loudoun County | Loudoun County Parkway Development | $31,000,000 | FY 2015-16 | Construction |
Loudoun County | Route 28 Northbound Widening –between the Dulles Toll Road and Sterling Boulevard | $20,000,000 | FY 2018-23 | Construction |
Loudoun County | Route 15 Bypass Widening: Battlefield Parkway to Montresor Road | $54,000,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Extend Shellhorn Road: Loudoun County Parkway (Route 607) to Randolph Drive (Route 1072) | $16,000,000 | FY 2018-23 | Right of way |
Loudoun County | Northstar Boulevard – Shreveport Drive to Tall Cedars Parkway | $64,805,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Prentice Drive Extension: Lockridge Road (Route 789) to Shellhorn Road (Route 643) | $76,230,000 | FY 2018-23 | Right of way, Construction |
Loudoun County | Dulles West Boulevard Widening: Loudoun County Parkway to Northstar Boulevard | $47,800,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Route 9 Traffic Calming | $12,112,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Evergreen Mills Road Intersection Realignments – Watson Road and Reservoir Road | $14,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Loudoun County | Construct Crosstrail Boulevard (Route 653): Sycolin Road to Dulles Greenway (Route 267) | $36,700,000 | FY2020-25 | Construction |
Loudoun County | Evergreen Mills Road Widening from Northstar Boulevard to Stone Springs Boulevard | $18,000,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
Prince William County | Route 28 From Linton Hall Road to Fitzwater Drive | $28,000,000 | FY 2014 | Engineering, Right of way, Construction |
Prince William County | Route 28 Widening: Route 234 Bypass to Linton Hall Road | $16,700,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
Prince William County | Route 28 Widening: Route 234 Bypass to Linton Hall Road | $10,000,000 | FY 2017 | Construction |
Prince William County | RT28 corridor improvements (Fitzwater Dr to Pennsylvania Ave) | $15,000,000 | FY 2018-23 | Construction |
Prince William County | Route 1 From Featherstone Road to Mary’s Way | $3,000,000 | FY 2014 | Design, Engineering |
Prince William County | Route 1 Widening: Featherstone Road to Mary’s Way | $49,400,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
Prince William County | Route 1 Widening: Featherstone Road to Mary’s Way | $11,000,000 | FY 2017 | Construction |
Prince William/Manassas | Route 28 Congestion Study – Godwin Drive Extension Alternative | $2,500,000 | FY 2015-16 | Study |
Prince William County | Route 28 Corridor Feasibility Study – Environmental Impact Statement (City of Manassas to Fairfax County) | $3,500,000 | FY 2018-23 | Study, Design |
Prince William County | Construct Route 28 Corridor Roadway Improvements | $89,000,000 | FY 2018-23 | Construction |
Prince William County | Construct Interchange at Prince William Parkway and Clover Hill Road | $1,900,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Construct Interchange at Prince William Parkway and University Blvd | $24,200,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Construct Interchange at Route 234 and Brentsville Road | $54,900,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Summit School Rd Extension and Telegraph Rd Widening | $11,000,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
Prince William County | Summit School Rd Extension and Telegraph Rd Widening | $24,000,000 | FY2020-25 | Construction |
Prince William County | North Woodbridge Mobility Improvements | $8,000,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
City of Alexandria | Traffic Signal Upgrades/Transit Signal Priority | $660,000 | FY 2014 | Design, Engineering, Construction |
City of Alexandria | Duke Street Transit Signal Priority Installation | $190,000 | FY 2015-16 | Design, Asset acquisition |
City of Alexandria | DASH Bus Expansion (5 New) | $1,462,500 | FY 2014 | Asset Acquisition |
City of Alexandria | Shelters and RTI for DASH/WMATA | $450,000 | FY 2014 | Construction |
City of Alexandria | Potomac Yard Metrorail Station EIS | $2,000,000 | FY 2014 | Planning, Desing, Engineering |
City of Alexandria | Potomac Yard Metrorail Station | $1,500,000 | FY 2015-16 | Engineering |
City of Alexandria | Potomac Yard Metrorail Station | $66,000,000 | FY 2017 | Design, Engineering, Construction |
City of Alexandria | West End Transitway Study | $2,400,000 | FY 2015-16 | Design |
City of Alexandria | West End Transitway: Northern Segment (Phase 1) | $2,200,000 | FY 2018-23 | Right of way |
City of Alexandria | Alexandria ITS Projects | $1,195,491 | FY 2018-23 | Design, Engineering, Construction |
City of Alexandria | Alexandria Bus Network ITS | $150,000 | FY 2018-23 | Asset acquisition, Other |
City of Alexandria | DASH Transit Service Enhancements and Expansion | $11,933,161 | FY 2018-23 | Construction, Asset Acquisition, Other |
City of Alexandria | Alexandria Duke St Transitway | $12,000,000 | FY 2018-23 | Design, Engineering |
City of Alexandria | Alexandria Duke St Transitway | $75,000,000 | FY2020-25 | Right of way, Construction, Asset acquisition |
City of Fairfax | Cue 35-Foot Buses (6 New) | $3,000,000 | FY 2015-16 | Asset Acquisition |
City of Fairfax | Chain Bridge Road Widening/Improvements | $5,000,000 | FY 2014 | Right of way, Construction |
City of Fairfax | Northfax – Intersection Improvements at Route 29/50 and Route 123 | $10,000,000 | FY 2015-16 | Construction |
City of Fairfax | Kamp Washington Intersection Improvements | $1,000,000 | FY 2015-16 | Construction |
City of Fairfax | Jermantown / Route 50 Roadway Improvements | $1,000,000 | FY 2015-16 | Construction |
City of Fairfax | Jermantown Road Corridor Improvements Project | $21,000,000 | FY 2018-23 | Design, Right of way, Construction |
City of Fairfax | Intersection Improvements at Eaton Place/Chain Bridge Road | $10,750,000 | FY 2018-23 | Design, Right of way, Construction |
City of Fairfax | Old Lee Highway Multimodal Improvements Phase 1 | $5,000,000 | FY 2018-23 | ROW, Construction |
City of Fairfax | Old Lee Highway Multimodal Improvements | $8,000,000 | FY2020-25 | Construction |
City of Fairfax | Roadway Network Northfax West | $2,500,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
City of Fairfax | Roadway Network Northfax West | $2,200,000 | FY2020-25 | Right of way, Construction |
City of Fairfax | Jermantown Road/Route 29 Intersection Improvements | $700,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
City of Fairfax | Government Center Parkway Extension | $3,540,000 | FY2020-25 | Right of way, Construction |
City of Falls Church | Funding for Bus Shelters | $200,000 | FY 2014 | Design, Engineering, Right of way, Construction |
City of Falls Church | Pedestrian Access to Transit | $700,000 | FY 2014 | Design, Engineering, Right of way, Construction |
City of Falls Church | Pedestrian Bridge at Van Buren Street | $300,000 | FY 2014 | Design, Engineering, Construction |
City of Falls Church | West Falls Church & Joint Campus Revitalization District Multimodal Transportation Project | $15,700,000 | FY 2018-23 | Design, Engineering, Right of way, Construction |
City of Falls Church | West Falls Church Access to Transit and Multimodal Connectivity | $6,900,000 | FY2020-25 | Design, Engineering, Right of way, Construction |
City of Falls Church | Downtown Falls Church Multimodal Improvements | $8,300,000 | FY2020-25 | Right of way, Construction |
City of Falls Church/NOVA Parks | Falls Church Enhanced Regional Bike Routes (W&OD) | $3,244,959 | FY 2018-23 | Design, Engineering, Construction |
City of Manassas | Route 28 Widening: Godwin Drive to the Southern City Limits | $3,294,000 | FY 2015-16 | Design, Engineering, Right of way, Construction |
Town of Dumfries | Route 1 (Fraley Blvd) Widening: Brady’s Hill Road to Dumfries Road | $6,900,000 | FY 2015-16 | Design, Engineering |
Town of Dumfries | Widen Route 1 (Fraley Blvd) to six lanes between Brady’s Hill Rd and Dumfries Rd (RT234) | $44,860,000 | FY 2018-23 | Right of way |
Town of Dumfries | Widen Route 1 (Fraley Blvd) to six lanes between Brady’s Hill Rd and Dumfries Rd (RT234) | $78,000,000 | FY2020-25 | Construction |
Town of Herndon | Herndon Metrorail Intermodal Access improvements | $1,100,000 | FY 2014 | Right of way, Construction |
Town of Herndon | Herndon Parkway Intersection Improvements at Van Buren St | $500,000 | FY 2014 | Construction |
Town of Herndon | Herndon Parkway Intersection Improvements at Sterling Rd | $500,000 | FY 2014 | Design, Engineering, Right of way, Construction |
Town of Herndon | East Elden Street Improvements & Widening | $10,400,000 | FY 2015-16 | Right of way |
Town of Leesburg | Route 7/Battlefield Parkway Interchange | $13,000,000 | FY 2015-16 | Design, Engineering, Right of way |
Town of Leesburg | Route 7 (East Market Street)/Battlefield Parkway Interchange | $20,000,000 | FY 2017 | Construction |
Town of Leesburg | Construct Interchange at Route 7 and Battlefield Parkway | $25,000,000 | FY 2018-23 | Construction |
Town of Leesburg | Edwards Ferry Road at the Route 15 Leesburg Bypass Grade Separation | $1,000,000 | FY 2014 | Design |
Town of Leesburg | Route 15 Bypass/Edwards Ferry Road Interchange | $1,000,000 | FY 2015-16 | Design |
Town of Leesburg | Interchange Improvements at Route 15 Leesburg Bypass and Edwards Ferry Road | $5,400,000 | FY 2018-23 | Design, Engineering |
Town of Leesburg | Construct Interchange at Route 15 Bypass and Battlefield Parkway | $2,000,000 | FY 2018-23 | Design, Engineering |
Town of Vienna | Mill St NE Parking Garage | $2,300,000 | FY 2018-23 | Asset Acquisition |
NVTC | Transit Alternatives Analysis Study in the Route 7 Corridor | $838,000 | FY 2014 | Study |
PRTC | PRTC New Gainesville Service (1 Bus) | $580,000 | FY 2014 | Asset Acquisition |
PRTC | Western Bus Maintenance & Storage Facility | $16,500,000 | FY 2015-16 | Construction |
VRE | VRE Lorton Station Second Platform | $800,270 (Withdrawn/cancelled the remaining amount from the originally approved $7,900,000) |
FY 2014 | Design, Engineering, Construction |
VRE | VRE Alexandria Station Tunnel and Platform Improvements | $1,300,000 | FY 2014 | Construction |
VRE | VRE Gainesville-Haymarket Extension Project Development | $1,500,000 | FY 2014 | Planning, Design |
VRE | Franconia-Springfield Platform Improvements | $13,000,000 | FY 2015-16 | Design, Engineering, Construction |
VRE | Rippon Station Expansion and Second Platform | $39,482 (Withdrawn/cancelled the remaining amount from the originally approved $10,000,000) |
FY 2015-16 | Design, Engineering, Construction |
VRE | Slaters Lane Rail Crossover | $7,000,000 | FY 2015-16 | Design, Engineering, Construction |
VRE | Crystal City Platform Extension Study | $400,000 | FY 2015-16 | Study |
VRE | VRE Crystal City Station Improvements | $4,000,000 | FY 2018-23 | Design, Engineering |
VRE | VRE Crystal City Station Improvements | $15,800,000 | FY2020-25 | Construction |
VRE | Manassas Park Station Parking Expansion | $500,000 | FY 2015-16 | Study |
VRE | Manassas Park Station Parking Expansion | $2,000,000 | FY 2017 | Design, Engineering |
WMATA | Traction Power Upgrades on the Orange Line in Virginia | $4,978,685 | FY 2014 | Design, Engineering, Construction |
WMATA | Blue Line Traction Power Upgrades | $17,443,951 | FY 2017 | Design, Engineering, Construction |
DRPT | Franconia‐Springfield Passenger Rail Bypass | $22,958,821 | FY2020-25 | Construction |
NVTA FUNDING TOTAL | $2,497,495,952 |
The projects shown below were approved by the Authority for funding but were withdrawn subsequently by the project sponsor.
Jurisdiction/ Agency | Project Title | NVTA Funding | NVTA Funding Program | Phases Funded |
---|---|---|---|---|
Fairfax County | I-66/Route 28 Interchange Improvements ** | $300,000,000 | FY 2017 | Design, Engineering, Environmental, Right of way, Construction |
VRE | VRE Rolling Stock Purchase | $19,800,000 | FY 2014 | Train Purchase |
VRE | VRE Alexandria Station Tunnel and Platform Improvements | $1,300,000 | FY2014 | Construction |
WMATA | Ten New Buses on Virginia Routes | $7,000,000 | FY 2014 | Bus Purchase |
WMATA | 8 Car Train Traction Power Upgrades | $8,995,000 | FY 2015-16 | Construction |
TOTAL | $335,795,000 |
**The Authority de-allocated $300 million from its FY2017 funding program for the I-66/Route28 Interchange Improvements, which were encompassed in the Transform I-66 Outside the Beltway Project.
NVTA Funding by Corridor:
Corridor | NVTA Funding |
---|---|
Rt. 7/Dulles Toll Road/Silver Line | $527,727,620 |
Loudoun County Parkway/Bi-County Parkway/Rt. 234 | $461,329,000 |
Route 28 | $349,598,670 |
Prince William Parkway | $263,100,000 |
Fairfax County Parkway | $204,611,000 |
I-66/US 29/US 50/Orange-Silver Line/VRE Manassas | $323,917,644 |
I-495 | $101,845,661 |
I-95/I-395/US 1/VRE Fredericksburg/Blue‑Yellow Line | $1,146,693,638 |
US 15 | $139,400,000 |
Columbia Pike/Braddock Road/VRE Manassas | $53,200,000 |
US 50 | $117,490,000 |
**Total will not match the total NVTA funds since projects overlap corridors.