Skip to content
Select Page
Loading Events

« All Events

  • This event has passed.

Columbia Pike Pedestrian Improvements Virtual Public Meeting (Fairfax County)

January 23, 2023 @ 7:00 pm

Fairfax County’s First Transportation Meeting of the Year to Focus on Annandale Connectivity

For Immediate Release
Jan. 13, 2023

Mason District Supervisor Penny Gross and the Fairfax County Department of Transportation (FCDOT) will hold a virtual public information meeting on pedestrian improvements along Columbia Pike between Backlick Road and Tom Davis Drive on Monday, Jan. 23, 2023, at 7 p.m. FCDOT staff will present information about the Columbia Pike Complete Streets Phase I project, preliminary design, answer questions and accept comments about the project. FCDOT is making arrangements to have Korean translation available during the meeting.

Meeting login information:

Meeting ID: 224 773 443 205; Passcode: 4KDDi7
Download Teams | Join on the web

  • Dial In: 571-429-5982; Phone Conference ID: 565 222 207#

Project Description

This project will construct a new 6-foot-wide sidewalk, ADA compliant curb ramps and a 6-foot-wide landscape panel along the south side of Columbia Pike from Backlick Road to Tom Davis Drive. Streetscape elements will be implemented based on feasibility and funding availability. A new high visibility crosswalk is proposed for installation at Tom Davis Drive to connect the new sidewalk to the existing pedestrian facilities on the north side of Columbia Pike. Construction of the proposed improvements will require right-of-way acquisition and utility relocations.

Project Background

The Columbia Pike Complete Streets Phase I Project is located in Annandale’s Central Business and Community Revitalization Overlay District. The project was created as a result of the Columbia Pike Pedestrian and Bicycle Study (May 2018), which indicated the need for updating pedestrian and bicycle access along the corridor. The project will complete a missing sidewalk gap and provide connectivity between commercial areas on the north and south sides of Columbia Pike within the project limits.

Submitting Feedback

Comments will be accepted at the public meeting and through Jan. 31, 2023. The project team also can accept feedback:

  • in writing to FCDOT, Columbia Pike Complete Streets Project, 4050 Legato Road, Suite 400, Fairfax, VA 22033
  • electronically via the project website. Use the link in the red feedback box at the bottom of the page.
  • by phone at 703-877-5600; TTY 711.

For more information about the project, visit https://www.fairfaxcounty.gov/transportation/projects/columbia-pike-phase1.

###

Details

Date:
January 23, 2023
Time:
7:00 pm
Website:
https://www.fairfaxcounty.gov/transportation/news/t1_23

Venue

Virtual

Organizer

Fairfax County